[Products]: Cantilever Form Traveler
[Introduction]:the weihe river bridge in tianshui, gansu, a key project of the zhuanglang-tianshui expressway, spans 291.7m with a 75+140+75m concrete continuous rigid frame, using toyou’s form traveler cantilever casting and planar rotation (58°/46.77° rotation angles, 20k/22k ton weights, 50.9m height), currently china’s tallest and gansu’s heaviest rotating bridge. toyou’s leasing model cuts costs, ensures progress via on-site services, boosting gansu’s expressway network and regional economy.
Show More
[Products]: Cantilever Form Traveler
[Introduction]:the yinchuan - Bayanhot Railway Great Wall - crossing mega bridge in ningxia features 48+80+48m prestressed continuous beams with single - box variable - height girders, constructed via TOYOU’s cantilever form travelers (8 sets supplied). with standardized design enabling 1 - day design cycle and 3 - day delivery, toyou ensures fast installation, cost savings, and safety systems (bottom supports, guardrails). praised with a commendation letter, the project aids regional transport and meets tight schedules via toyou’s nationwide turnover bases.
Show More
[Products]: Cantilever Form Traveler
[Introduction]:the first sub - branch of package 11 in yangzhou’s jiangdu district on the shanghai - nanjing section of the shanghai - nanjing - hefei high - speed railway uses toyou’s cantilever form travelers for 62+112+62m and 48+80+48m continuous beams. as a key “eight vertical and eight horizontal” project, it optimizes yangtze river rail networks and boosts delta integration. toyou’s standardized design (1 - day cycle) and rapid 3 - day delivery via turnover bases meet tight schedules and budget needs, ensuring project efficiency.
Show More
[Products]: Cantilever Form Traveler
[Introduction]:the xiaoqinghe re-navigation project in shandong, part of the "one vertical and three horizontal" inland waterway system, involves 4 navigation buildings, 36 bridge reconstructions across 5 cities. toyou supplied over 20 lightweight form travelers with pin-connected structures, 100% flaw-detected welds, and dual-function sliding beams, ensuring smooth construction and client praise. with 4th-gen patents and global bases cutting costs by 30-50%, toyou aims to lead infrastructure solutions worldwide.
Show More
[Products]: Cantilever Form Traveler
[Introduction]:The Junqi Main Canal Bridge on the Shijiazhuang-hengshui Expressway in Shenzhou, Hebei, spans 148 meters with a 40 + 60+40 - meter prestressed concrete box - shaped continuous beam structure, built by form traveler cantilever casting. Under tight schedules, TOYOU's engineer team, with over 30 members, ensured smooth construction through standardized services, personnel optimization, and quality control. Their efforts led to a commendation from Shijiazhuang Highway and Bridge Construction Group. By offering pre - training, on - site guidance, and full - process technical support, TOYOU continues to deliver high - quality products and services, winning customer trust and creating value in the construction industry.
Show More
[Products]: Cantilever Form Traveler
[Introduction]:the xi'an link project on the xi'an-yan'an railway in shaanxi includes multiple continuous beams (40+2×64+40m, 60+100+60m double/single-track, 2×88m t-frame), using single-box single-cell structure with toyou’s form traveler cantilever casting. toyou optimized load-bearing/rolling suspension components to match site materials, saving costs, and provided on-site tracking, training, and inspections. as a key "14th five-year" project, it will cut xi'an-yan'an travel time to 1 hour, boosting western development and high-speed rail network optimization.
Show More